Welcome to Henan Mine Crane Co.,Ltd.

Tyre wheels girder transpotation equipment

Girder transporter can carry bridge girder erection machine to transfer to another site in short distance between bridges, to pass twin track tunnel on railway special line for transport of passenger

Product Description

Transporting girder vehicle can transport 20m, 24m, 32m box-girder concrete girder for double track railway special line with speed 350km/h and 250km/h  for transport of passenger , from precast site to girder-erecting workstation via shortcut, roadbed, bridge (steel structure continuous girder and continuous girder with steel ,concrete integrated included),and culvert , and complete relevant girder-erecting work with bridge girder erection machine .Girder transporter can carry bridge girder erection machine to transfer to another site in short distance between bridges, to pass twin track tunnel on railway special line for transport of passenger

Features
  • Vehicle width 7000mm, overall length 43200mm
  • the vehicle is high-tech products integrated with “motor, electrical device and hydraulic system”,
  • adopting hydraulic drive, hydraulic suspension and independent steering for each walk bridge and frame hydraulic elevating leveled, using technical grade microcomputer to control and drive, swerve, go up and down, leveling , as well as realize many kinds of running modes such as direct movement, diagonal movement, splayed swerve and semi splayed swerve.
  • The whole machine moves very flexibly to achieve driving without slipping or with less slipping and to complete work task in smaller working site
  • Select and use excellent general parts and standard components during design, all main auxiliary equipments are of famous brand at home and abroad, combination property and engineering level of the whole machine reach international advanced level.
Name:Tyre wheels girder transpotation equipment
brand KuangShanModel Number Beam lifter
After-sales Service ProvidedEngineers available to service machinery overseasPlace of OriginXinjiang or Henan, China(mainland)
Benefits
Best Quality
During the drilling equipment production, we strictly follow the regulations of the ISO9001: 2008 quality control system.
Fast Delivery
Strong factory, strong productivity, able to deliver on time, so you have no worries.
Global Service
We always provide people a complete solution focused of any business.
Customer Site
Packing and Shipping

We strictly manage packaging specifications and transportation requirements,Wooden pallets with plastic filmor according to your request.

FAQ
What are your prices?

Our prices are subject to change depending on supply and other market factors. We will send you an updated price list after your company contact us for further information.

Do you have a minimum order quantity?

Yes, we require all international orders to have an ongoing minimum order quantity. If you are looking to resell but in much smaller quantities, we recommend you check out our website.

Can you supply the relevant documentation?

Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required.

What is the average lead time?

For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.

Get In Touch
Please feel free to leave a message. We will reply you in 24 hours.
REQUIRED *
OPTIONAL
We Provide One-Stop Crane Solution Services.
whatsappWhatsapp Message Email